Installed capacity: 2 x10.6MW
Year of commissioning: 2012
Engineer: Nippon Koei (Japan)
Turbine type: Vertical Francis
Generator manufacturer: Fujian Nandian (China)
Contractor: Sino Hydro (China)
Sang’oro is a cascade power station 4.7km from the Sondu Miriu power station. Water is conveyed from Sondu Miriu tailrace through a 4.7 km channel and a 133.6m length penstock from the head tank to the power station. Water from the station is released through a tailrace back to Sondu Miriu River. Power from the station is fed to the national grid through a 5km long 132kV transmission line to the Sondu Miriu sub-station.