Installed capacity: 3 x 24MW
Head: 36m

Units 1 & 2
Year of commissioning:     1968
Year of upgrade: 2013
Turbine manufacturer:     BOVING
Generator manufacturer:     Associated Electric Industries

Unit 3
Year of commissioning:     2013
Turbine manufacturer:     Andritz
Generator manufacturer:     Andritz

Commissioned in 1968, Kindaruma was the first major power station in independent Kenya. It was originally designed with a provision of three turbine generator units, but only two rated at 20MW were installed at the beginning.  Subsequent installation of the third unit and upgrading of the earlier two has resulted in putting the current production of the station at 72MW. Power from Kindaruma is transmitted directly to Nairobi via a 132KV line or to Kamburu 132kV substation.  The water is then passed down to Kiambere Dam.

ft Featured Video

ftAwards

Group 585
Group 586
Group 587
Group 581
 
 
 

ftOur Contacts

Head Office

  • KenGen Pension Plaza II
    Kolobot Road, Parklands
  • P. O. BOX 47936, 00100, Nairobi
  • TEL:
  • +254 711 036-000
  • +254 732 116-000
  • +254 020 366-6000
  • Email: pr@kengen.co.ke

© 2025 KenGen