• 0711036000
  • Mon - Thur 07:45 - 17:00 (Fri 07:45 - 16:30)
  • KenGen Pension Plaza II

Installed capacity: 2 x 20MW
Year of commissioning: 1981
Turbine manufacturer: ESCHER WYSS
Generator manufacturer: ABB (ASEA BROWN BOVERI)
Estimated cost of development: Kshs1.5 billion (1981)
Head: 49m

Masinga is the main reservoir in the cascade, with a reservoir capacity of 1.56 billion cubic meters of water and is therefore used for water regulation throughout the year. Two vertical Kaplan turbines drive two generators capable of generating 40MW of power.  The power generated at Masinga is transmitted to Kamburu and Mt. Kenya region. From Kamburu, power is transmitted to Nairobi though two 220kV lines. The reservoir occupies a surface area of 120km2.

ft Featured Video

ftAwards

Group 585
Group 586
Group 587
Group 581
 
 
 

ftOur Contacts

Head Office

  • KenGen Pension Plaza II
    Kolobot Road, Parklands
  • P. O. BOX 47936, 00100, Nairobi
  • TEL:
  • +254 711 036-000
  • +254 732 116-000
  • +254 020 366-6000
  • Email: pr@kengen.co.ke

© 2024 KenGen